
BREVILLE / SAGE STEAM PROBE GUIDE
Replace the three steam-boiler water-level probes in a compatible Dual Boiler or Oracle machine.
Follow this probe-set procedure when a probe fault has been identified. Confirm your machine and kit match before opening the case.
Reasons for this repair
- Steam boiler not filling as expected
- Incorrect water-level readings
- Sensor faults encountered during descale
Check compatibility
- 120 V: pre-2238
- 240 V: pre-2242
- Compare these cutoffs with the kit listing and your machine before ordering.
Before you start
- Switch off at the machine and wall outlet, unplug the power cord and allow the machine and boiler to cool completely.
- Photograph and label the three probe connections before removing any wire. Restore every connector to its original probe.
- Keep water, lubricant and tools away from nearby wiring. Do not reconnect power until the top cover and all screws are back in place.
- If a probe, wire or clip does not come free without force, stop and seek help from a qualified technician.
Tools and supplies
- Phillips screwdriver
- T20 Torx driver
- Small pliers
- Small pick or flat screwdriver for the O-rings
- Clean water or a small amount of food-safe lubricant (optional)
- Replacement steam probe set with O-rings
Select any photo to see it at full size.
1. Open the machine
Work only on a cool, unplugged machine. Keep the cover screws together.
2. Disconnect and remove the old probes
Record the wiring layout before you pull a connector.
-
Disconnect the probe wires
Photograph each terminal and note which wire belongs to each probe.
Grip each terminal connector with small pliers and gently pull it off the probe; do not pull on the wire. 
-
Release the retaining clips
Pull out each probe retaining clip, keep the clips safe, then lift out the three old probes. 
3. Renew the seals and fit the new probes
Keep track of the probe positions while the boiler ports are open.
-
Replace the O-rings
Lift the old O-ring from each probe port, clean the port, and fit its replacement O-ring. 
Keep dirt and loose pieces out of the open ports.
-
Install the three new probes
Slightly wet each probe or use a small amount of food-safe lubricant if needed to help it seat.
Press each new probe firmly into its matching port; place the short probe on the right-hand side, where the red wire connects. 
The short probe belongs on the right with the red wire. Match the positions you photographed before removal.
4. Reassemble and check
Complete the electrical and mechanical reassembly before restoring power.
-
Secure the probes and reconnect their wires
Refit the retaining clips, then reconnect each sensor wire to the same probe it came from. Confirm the red wire is on the short right-hand probe.
-
Close the machine before testing
Refit the top cover and all front and rear screws. Reconnect power only after the case is closed, then check normal boiler filling and water-level operation. If the fault remains or water leaks, switch off, unplug and seek service.
Final check
- All three new O-rings and probes are seated in their original ports.
- Every retaining clip is fitted.
- Each wire is reconnected to its original probe; the short right-hand probe has the red wire.
- The top cover and all four outer screws are fitted before the machine is powered.
- On a normal check, the boiler fills and reports its level as expected, with no external leak.
DIY repairs carry risk. If anything is uncertain, stop and consult a qualified technician. Read our full disclaimer.

